• 京町家net ホーム
  • サイトマップ
  • アクセス・お問い合わせ
はじめに京町家再生研究会京町家作事組京町家友の会京町家情報センター

All Articles
Published: June 28, 2010

Kamanza-cho“Cho-ie” Renovation Begins

Flooring and Wall from Earlier Remodeling Dismantled
Damaged Post and Beams Inspected


Full-scale renovation work began on June 15 (Tue). Original posts, beams, walls, and other structural elements were inspected for damage. Flooring on the first floor and one wall from a previous remodeling were removed and exposed structural elements were inspected to determine how renovation would proceed. Renovation foremen assembled on June 25 (Fri) for discussions and former “Cho-ie” resident, Mr. Kato, was also present to talk about his experiences living in the house.


Briefing on structural conditions

Listening to former resident, Mr. Kato

Rain-damaged wall behind dismantled closet

Broken and warped 2nd fl. floor beams